-Do the schedule with Activity on Node and also draw the schedule
AND
-Do the schedule with Activity on Arrow and also draw the schedule
PS: Use the construction estimating rsmeans book for any additional information. The excel file for the assignment is uploaded and additional notes are posted.
< >d
>d
> > >d visi > esti ation o medi al clinic
th
/depth
quantity foot foot 1 4
. 1 0 9. 1 44 0.9 5 1 3 0
medical clinic
No Item 3.6 1 1 5
0+ +0. =1.1=3.60′
0+ 0+0.3+0.3=1.1=3.60′
2 1 L=c.l-width/2 6
1 3 712
0.98 4
1 L=c.l-width/2 L=c.l-width/2 5
1
1 4 03.6
58 44 1 is upto the plinth level
5 ‘
1.31 195 1 5856
1 1 2 3
0.984 3 1 9 0.984 4 7 9 0.984 6 9 9 0.984 8 5 5 0.984 5 5 7 0.984 7 7 5 0.984 6 3 52
2 0.984 3 13 5.52
3 0.15 0.984 1 D1(3’*6’8″) 0.15 0.984 7 D2(4’*9′) 6892
0.15 0.984 9 D3(6’*9′) 4
0.15 0.984 8.3 5 D4(8’*9′) 114
0.15 0.984 5.3 5 w1(5’*5′) 0.15 0.984 7 W2(7’*7′) 0.15 0.984 6.3 3 W3(6’*5′) 4 0.3 1 5 1.4 0.984 1 6 1.4 0.984 1 7 a b horizontal wall c horizontal wall d horizontal wall e horizontal wall f horizontal wall g horizontal wall h horizontal wall i horizontal wall horizontal wall k horizontal wall l horizontal wall m horizontal wall n horizontal wall o horizontal wall height length No 1 Waiting room ( 14’*15′) a 0.1 15 1 vertical wall Doctor office(25’*15′) b 1.5 0.1 15 1 vertical wall 1.5 0.1 15 1 vertical wall playroom(15’*12′) e 0.1 12 1 vertical wall restroom(16’*19′) f washroom( g break room h 0.1 32 1 vertical wall Halls j 1 0.1 10 1 vertical wall processing room n 1.4 0.1 14 1 horizontal wall 2 1.5 0.1 15 1 horizontal wall 1.5 0.1 15 1 horizontal wall 1.5 0.1 15 1 horizontal wall 1 0.1 10 1 horizontal wall 1.2 0.1 12 1 horizontal wall vertical wall vertical wall 1.9 0.1 19 1 horizontal wall vertical wall 1 0.1 10 1 horizontal wall 1.5 0.1 15 1 horizontal wall 1.9 0.1 19 1 horizontal wall vertical wall 1.2 0.1 12 1 horizontal wall 1.5 0.1 15 1 horizontal wall 3 1.4 0.1 14 1 horizontal wall 4 6.7 3 1 D1(3’*6’8″) 9 4 7 D2(4’*9′) 9 6 9 D3(6’*9′) 9 8 5 D4(8’*9′) 7 7 7 W2(7’*7′) 5 20.1 6.7 3 1 D1(3’*6’8″) 6 20.1 6.7 3 1 D1(3’*6’8″) 1 158 141 1 2 4 15 15 1 Doctor office(25’*15′) 10 10 1 Operation theator(15’*15′) 12 15 1 utility base(10’*10′) 19 16 1 playroom(15’*12′) 9 8 7 restroom(16’*19′) 25 20 1 washroom( 19 15 1 break room 32 40 1 Examination room 10 12 1 Halls 13 12 1 x-ray laboratary 12 12 1 processing room 15 14 1 nurses office quantity sq.m height breadth length no item sr no 2 5 9 15 1 2 9 0.2 4 7 D2(4’*9′) 9 0.2 6 9 D3(6’*9′) 3 375 15 25 1 Waiting room ( 14’*15′) 1 375 15 25 1 Waiting room ( 14’*15′) 2 375 15 25 1 Waiting room ( 14’*15′) 3 375 15 25 1 Waiting room ( 14’*15′) 1 210 15 14 1 2 375 15 25 1 Waiting room ( 14’*15′) 3 375 15 25 1 Waiting room ( 14’*15′) 144 12 12 1 processing room 210 15 14 1 nurses office 5 375 15 25 1 Waiting room ( 14’*15′) 120 10 12 1 Halls 6 125 5 5 5 w1(5’*5′) UNIVERSITY OF HARTFORD
CE 442
CONSTRUCTION ESTIMATING / SCHEDULING
PROFESSOR LEWANDOWSKI
Estimating Project
Due Date:
Assignment: Assemble a detailed construction estimate to construct the Medical Clinic as per the attached
plans and specifications. Bids will be opened publicly in class. Detailed estimates shall be
submitted in spreadsheet form with costs broken down into the 16 divisions as per the Masterformat
coding system. All assumptions shall be listed on a separate sheet and attached to the estimate.
It is expected that your detailed estimate will be a complete estimate which covers every item
necessary to construct this facility. As part of the proposal, you will submit alternate #1 for the
add or deduct amount to install the foundation as per sheet S-1A and alternate #2 for the add or
deduct amount to construct masonry walls as per sheet S-1B in lieu of the wood framing as
specified. In addition you will submit an alternate price for each of alternate items #3, 4, and 5 as
indicated in the project specifications. Please disregard the soils report section, it is not applicable.
I have made some minor modifications to the plans by hand in an effort to clarify some items and
make others more applicable to this region. In your estimate in the appropriate sections, please carry
a line item allowance of $50,000 for medical equipment and $2,300 for lighting fixtures.
h
2
i
o
n
1
a
b
l
e
quantity
m
f
c
division 2
sr
no
Item
No
Len
g
Breadth
Height
sq m
foot
1
Subsurface investigation
4
0
9
0.
7
5
29.7
2
site cleaning
44
0.9
3
6
3
excavation wor
k
19
8
4
landscaping (romoval of unwanted plants)
41
58
23
78
5
labour living space preparation
20
45
12
32
40
Sheet1
quantity calculation
Division 2 concrete
quantity sq m Height Breadth
length
Sr no
6998.4
3.6
540
excavation for foundation
length of long wall
L=c.l-width/2
300-3.60/2=540
B=
0.1
90
15
H=
0.2
0.3
B.B.C or P.C.C (1:4:8)
848.49
375
0.65
2.95
44
2.5
300-2.95/2= 442.5
564.7152
0.98
1.9
294
brick work in foundation
1st step 1.96′
L=c.l-width/2
300-1.96/2= 294
39
5.3
1.6
246
2nd step( 1.64)
300-1.64/2= 246
1
3rd step(0.40)
217.
13
25
0.8
1.3
195
300-1.31/2= 195
Earth filling upto plinth
14
0.55
hospital area (44’*58′)
this area include every single room of hospital
0.55
height
D.P.C(DAMP PROOF COARSE) AT PLINTH LEVEL
5CM=0.
16
L=c.l-width/2*NO. OF JUNCTIONS
m^2
255.45
300-1.31/2= 195*
10
Sheet2
quantity calculation medical clinic
Division 3 masonary
quantity sq m Height Breadth length No Item Sr no
1429
1.4
9.84
0.984
1476
BRICK MASONARY IN SUPER STRUCTURE
L=c.l-width/2
300-9.84/2= 1476
DEDUCTION OF DOOR AND WINDOWS
19.27656
6.5
D1(3’*6’8″)
247.968
D2(4’*9′)
478.224
D3(6’*9′)
354.24
D4(8’*9′)
123
w1(5’*5′)
337.512
W2(7’*7′)
88.56
W3(6’*5′)
7
6.7
v1(3’*2′)
1
72
Lintel quantity deduction
0.48708
3.3
4.44276
4.3
8.3
6.3
6.
125
3.9
7.54236
7.3
2.78964
33.6675
Brick work in super strucutre
12532.3325
This is the brick work after the deduction of lintel, doors & windows
6683.4
158
141
R.C.C SLAB
L=141
B=158
H=0.3′
190.1088
138
BRICK work in parapet wall
L=138′
horizontal wall
216.2832
157
L=157′
vertical wall
plastering work [room wize]
Waiting room ( 14’*15′)
horizontal wall
vertical wall
Doctor office(25’*15′)
vertical wall
Operation theator(15’*15′)
vertical wall
utility base(10’*10′)
vertical wall
playroom(15’*12′)
vertical wall
restroom(16’*19′)
vertical wall
washroom(
vertical wall
break room
vertical wall
Examination room
vertical wall
Halls
j
vertical wall
reception office
vertical wall
admin office
vertical wall
x-ray laboratary
vertical wall
processing room
vertical wall
nurses office
vertical wall
Sheet3
quantity calculation
division 4 paint
quantity
sq.m
breadth
item
sr no
priamry coat of plaster of paris on the walls
1.4 0.1 14 1 horizontal wall
1.5
2.5 0.1 25 1 horizontal wall
Operation theator(15’*15′) c
1.5 0.1 15 1 horizontal wall
utility base(10’*10′) d
1 0.1 10 1 horizontal wall
1 0.1 10 1 vertical wall
1.5 0.1 15 1 horizontal wall
1.2
1.6 0.1 16 1 horizontal wall
1.9 0.1 19 1 vertical wall
0.8 0.1 8 1 horizontal wall
0.9 0.1 9 1 vertical wall
1.5 0.1 15 1 horizontal wall
1.9 0.1 19 1 vertical wall
Examination room i
4 0.1 40 1 horizontal wall
3.2
1.2 0.1 12 1 horizontal wall
reception office k
1.5 0.1 15 1 horizontal wall
1.5 0.1 15 1 vertical wall
admin office l
1.6 0.1 16 1 horizontal wall
1.9 0.1 19 1 vertical wall
x-ray laboratary m
1.2 0.1 12 1 horizontal wall
1.3 0.1 13 1 vertical wall
1.2 0.1 12 1 horizontal wall
1.2 0.1 12 1 vertical wall
0.1 nurses office o
1.5 0.1 15 1 vertical wall
coat of latex paint
1.4 0.1 14 1 Waiting room ( 14’*15′) a
vertical wall 2.5 0.1 25 1 Doctor office(25’*15′) b
vertical wall 1.5 0.1 15 1 Operation theator(15’*15′) c
vertical wall 1 0.1 10 1 utility base(10’*10′) d
vertical wall 1.5 0.1 15 1 playroom(15’*12′) e
vertical wall 1.6 0.1 16 1 restroom(16’*19′) f
1.9 0.1 19 1 horizontal wall
0.8 0.1 8 1 washroom( g
0.9 0.1 9 1 horizontal wall
1.5 0.1 15 1 break room h
vertical wall 4 0.1 40 1 Examination room i
3.2 0.1 32 1 horizontal wall
1.2 0.1 12 1 Halls j
vertical wall 1.5 0.1 15 1 reception office k
vertical wall 1.6 0.1 16 1 admin office l
vertical wall 1.2 0.1 12 1 x-ray laboratary m
1.3 0.1 13 1 horizontal wall
1.2 0.1 12 1 processing room n
0.1 vertical wall
1.4 0.1 14 1 nurses office o
0 vertical wall
0
final coat of sherwins william paint
0 Waiting room ( 14’*15′) a
1.5 0.1 15 1 vertical wall
Doctor office(25’*15′) b
2.5 0.1 25 1 horizontal wall
1.5 0.1 15 1 vertical wall
Operation theator(15’*15′) c
1.5 0.1 15 1 horizontal wall
1.5 0.1 15 1 vertical wall
utility base(10’*10′) d
1 0.1 10 1 horizontal wall
1 0.1 10 1 vertical wall
playroom(15’*12′) e
1.5 0.1 15 1 horizontal wall
1.2 0.1 12 1 vertical wall
restroom(16’*19′) f
1.6 0.1 16 1 horizontal wall
1.9 0.1 19 1 vertical wall
washroom( g
0.8 0.1 8 1 horizontal wall
0.9 0.1 9 1 vertical wall
break room h
1.5 0.1 15 1 horizontal wall
1.9 0.1 19 1 vertical wall
Examination room i
4 0.1 40 1 horizontal wall
3.2 0.1 32 1 vertical wall
Halls j
1.2 0.1 12 1 horizontal wall
1 0.1 10 1 vertical wall
reception office k
1.5 0.1 15 1 horizontal wall
1.5 0.1 15 1 vertical wall
admin office l
1.6 0.1 16 1 horizontal wall
1.9 0.1 19 1 vertical wall
x-ray laboratary m
1.2 0.1 12 1 horizontal wall
1.3 0.1 13 1 vertical wall
processing room n
1.2 0.1 12 1 horizontal wall
1.2 0.1 12 1 vertical wall
0.1 nurses office o
1.4 0.1 14 1 horizontal wall
1.5 0.1 15 1 vertical wall
Painting the doors
applying the potene to the doors for fineness
20.1
252
486
360
125 5 5 5 w1(5’*5′)
343
90 5 6 3 W3(6’*5′)
78 2 3 13 v1(3’*2′)
Applying paint to the doors and windows
252 9 4 7 D2(4’*9′)
486 9 6 9 D3(6’*9′)
360 9 8 5 D4(8’*9′)
125 5 5 5 w1(5’*5′)
343 7 7 7 W2(7’*7′)
90 5 6 3 W3(6’*5′)
78 2 3 13 v1(3’*2′)
Applying polish to the doors
252 9 4 7 D2(4’*9′)
486 9 6 9 D3(6’*9′)
360 9 8 5 D4(8’*9′)
125 5 5 5 w1(5’*5′)
343 7 7 7 W2(7’*7′)
90 5 6 3 W3(6’*5′)
78 2 3 13 v1(3’*2′)
Sheet4
quantity calculation
division 5 door window ceiling
quantity sq.m height breadth length no item sr no
Doors of inside buildings
20.1 6.7 3 1 D1(3’*6’8″)
252 9 4 7 D2(4’*9′)
486 9 6 9 D3(6’*9′)
360 9 8 5 D4(8’*9′)
125 5 5 5 w1(5’*5′)
343 7 7 7 W2(7’*7′)
90 5 6 3 W3(6’*5′)
78 2 3 13 v1(3’*2′)
22278
sill plate on all concrete surface
L=141′
B=158′
wooden ceiling in everyroom
375 15 25 1 Waiting room ( 14’*15′)
225
100
180
304
504
500
285
1280
120
225 15 15 1 reception office
304 19 16 1 admin office
156
144
210
Sheet5
quantity calculation
division 6 wood work
1350
wooden block of plywood in rooms
applying plastic ply to doors to avoid moisture
3.9 6.5 0.2 3 1 D1(3’*6’8″)
50.4
97.2
72 9 0.2 8 5 D4(8’*9′)
Rough carpentary
sill plates all around the walls of room
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 utility base(10’*10′)
304 19 16 1 playroom(15’*12′)
504 9 8 7 restroom(16’*19′)
500 25 20 1 washroom(
285 19 15 1 break room
1280 32 40 1 Examination room
120 10 12 1 Halls
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
144 12 12 1 processing room
210 15 14 1 nurses office
Sheet6
quantity calculation
division 7 electronic work
quantity calculation sq.m height breadth length no item sr no
underground wiring in rooms
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 utility base(10’*10′)
304 19 16 1 playroom(15’*12′)
504 9 8 7 restroom(16’*19′)
500 25 20 1 washroom(
285 19 15 1 break room
1280 32 40 1 Examination room
120 10 12 1 Halls
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
144 12 12 1 processing room
210 15 14 1 nurses office
electric bulbs and boards in each room
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 utility base(10’*10′)
304 19 16 1 playroom(15’*12′)
504 9 8 7 restroom(16’*19′)
500 25 20 1 washroom(
285 19 15 1 break room
1280 32 40 1 Examination room
120 10 12 1 Halls
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
144 12 12 1 processing room
210 15 14 1 nurses office
elecctric fans in each rooms
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 utility base(10’*10′)
304 19 16 1 playroom(15’*12′)
504 9 8 7 restroom(16’*19′)
500 25 20 1 washroom(
285 19 15 1 break room
1280 32 40 1 Examination room
120 10 12 1 Halls
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
144 12 12 1 processing room
210 15 14 1 nurses office
Sheet7
quantity calculation
division 8 furnishing works
quantity sq.m height breadth length no Item sr no
tiles
210 15 14 1 Waiting room ( 14’*15′)
375 15 25 1 Doctor office(25’*15′)
225 15 15 1 Operation theator(15’*15′)
100 10 10 1 utility base(10’*10′)
180 12 15 1 playroom(15’*12′)
304 19 16 1 restroom(16’*19′)
504 9 8 7 washroom(
500 25 20 1 break room
285 19 15 1 Examination room
1280 32 40 1 Halls
120 10 12 1 reception office
225 15 15 1 admin office
304 19 16 1 x-ray laboratary
156 13 12 1 processing room
144 12 12 1 nurses office
5122
polishing of tiles
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 utility base(10’*10′)
304 19 16 1 playroom(15’*12′)
504 9 8 7 restroom(16’*19′)
500 25 20 1 washroom(
285 19 15 1 break room
1280 32 40 1 Examination room
120 10 12 1 Halls
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
144 12 12 1 processing room 5122 210 15 14 1 nurses office
placement of carpet in rooms
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 utility base(10’*10′)
304 19 16 1 playroom(15’*12′)
504 9 8 7 restroom(16’*19′)
500 25 20 1 washroom(
285 19 15 1 break room
1280 32 40 1 Examination room
120 10 12 1 Halls
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
4702
wall paintings
one wall in each room
225 15 15 1 Doctor office(25’*15′)
100 10 10 1 Operation theator(15’*15′)
180 12 15 1 playroom(15’*12′)
304 19 16 1 restroom(16’*19′) 504 9 8 7 break room
500 25 20 1 Examination room
225 15 15 1 reception office
304 19 16 1 admin office
156 13 12 1 x-ray laboratary
144 12 12 1 processing room
210 15 14 1 nurses office
curtains on windows
343 7 7 7 W2(7’*7′)
90 5 6 3 W3(6’*5′)