1
IT 509 INFORMATION SYSTEMS ANALYSIS AND DESIGN
TERM PROJECT AIRPORT 3
You will be the IT Manager to improve the performance of the local AIRPORT PASSENGER PROCESSING SYSTEM. The
new airport will have lees employees and faster process timing. This is to make the Airport more efficient and more
secure.
The new system will replace the boarding-pass and ID
Control personnel with IT System. The passenger will
walk through a passage surrounded with cameras
and other remote readers. Each customer will be
given and RFID bracelets when they enter to the
airport.
NEW AIRPORT IT SYSTEM
• Airport already has 3 entry points (terminals) .
• You will be upgrading the all current airport terminals. There will be no addition of new terminals.
• One local area network (LAN) at each terminal.
• In this new system, the first step, passenger to the get the RFID bracelet at the automated kiosk, This ATM type
machine has face recognition cameras, finger-print reader and connection to DMV and IRS to authenticate the
passenger and update the Airport database. This is the only step where passenger will stop and wait for the
machine to put the RFID bracelet on his/her wrist. Then, passenger with RFID bracelet never stops until seating
in the aircraft.
• LAN parameters for each terminal:
o 15 new desktop computers going to be used.
o There will be 5 face recognition cameras
o 3 finger-print recording stations
o 5 customer RFID readers (captures the identification of the customer in
the airport) to make sure passenger goes to the correct gate.
• One Centralized database will record and authenticate each passenger in the airport terminal.
• New data network to connect all sections (terminals) to the main database.
• New data network to connect airport IT system to the other external IT system for proper ID and payment ( i.e.
credit card companies)
2
F I N A L R E P O R T S E C T I O N S
You will be developing NEW IT SYSTEM and the counter measures for cyber-attacks. Prepare your recommendations by
covering the following sections.
SECTION 1: LAN
Design LANs that will be used in the airport. One LAN design will be used in all terminals. The same requirements for all
terminals. Expectations:
1- Provide the block diagram of LAN design with components of the Local Area Network. Use https://www.draw.io/ to
develop/draw network diagrams. Drawing is for one terminal only. All terminals have the same LAN. You must have
your name on the LAN diagram.
2- In a table format, provide the IT shopping list (Hardware and software) for all LANs in the airport. List of
equipment/devices and software. You list should address all needs IT components for the airport. All terminals
SECTION 2: Project Management
• It takes one week to determine how you are going integrate the new system into the current system
• Start construction/renovation new airport entry sections for IT System (all terminals )
• Design the new IT System (Cameras, Fingerprint readers, RFID readers and the database) for all terminals [ 1 weeks]
• When the new IT System Design done, then Start training of staff for the new system (Start with Logical and the do
physical/hands on when new system installed). The end date is related the final test runs (see below)
• Then, Buy/order the new system complements ( HW and SW) [ 1 week]
• Once you order the system, it takes 2 weeks to new equipment arrive in the local warehouse
• New equipment cannot wait more than one week in the local warehouse. The warehouse has deadline.
• The renovation of the new airport entry sections must be completed before the warehouse deadline ends.
• Install the new IT system ( all LANs) in all terminals [2 week]
• After the IT System instantiation done, do test run to make sure new IT system works in all locations [1 week]
• End the training of staff once you have test runs completed. You cannot end training if the test runs not completed
successfully
• When the training completed, then deliver the systems to the Manager. And, then close the project. [ one week]
Section 2.a Develop WBS and Gantt Chart
Section 2.b Develop the PERT/CPM chart that shows the project
Section 2.c And, show the CRITICAL PATH
https://www.draw.io/
3
SECTION 3: RECOMMENDATIONS FOR SECURITY
Prepare the Control Spreadsheet which covers
• List of IT Assets with priority/importance weights (100 the most essential one)
• Disruption, destruction and disaster cases
• Intrusion (both external and inertial)
• List of control measures to protect the IT system
• Complete Control Spreadsheet
IT Assents Regional destruction, damage Company specific intrusion
Fire Flood Power loss Circuit failure External
intruder
Internal
intruder
YOU CAN USE THE FOLLOWING CONTROL MEASURES
1. Disaster recovery plan
2. Halon fire system in database room; sprinklers in the rest of building
3. Not on or below ground level
4. UPS (uninterruptible power source)
5. Network contract guarantees from Data-network providers.
6. Extra fiber data-network laid in different sections of the airport
7. Virus checking software present and updated
8. Extensive user training about viruses and reminders in monthly newsletter
9. Employee must have Strong password
10. Extensive user training about password security and reminders in monthly newsletter
11. Firewall to control incoming and outgoing network traffic
4
TERM PROJECT POWERPOINT PRESENTATION’S LAYOUT
One Slide STUDENT INFO & MAIN PARAMETERS OF AIRPORT
One or Two Slides LAN
One or Two Slides PERT/CPM chart
One or Two Slides SECURITY
RULES
• You should consider the provided guide “PowerPoint-Rules.ppt “
• Total slide number: Min 6 Slides, Max 10 Slides
• You should name the document as: Yourinitilas_PresentationFinal
• You should be submitting the PowerPoint before it’s deadline